Thursday, September 4, 2008

Began assembling the canvas peices.First the girder for the cross bracing and the subsection
that controls the tension were checked.Minor adjustments were made to the
planar surfaces that control the canvas sheeting before the paint is
applied.
This will need to be a very sturdy construction as there will be a long journey for the canvas
when the work is completed.
Even the type of canvas is limited by the travel requirement.

No comments: